CXCore
Commissioning Intelligence

Commissioning complete. Records ready.

CX Core eliminates the wait. From Stage 1 to 5 hold points, asset registers and digital record sheets — your packs are ready the second the work is commissioned.

Zero Admin Delay
Mechanical plant room services — pipework, valves and cable containment ready for commissioning

Stage 1–5 hold points

Every MEP system carried through five commissioning hold points — strategy, installation, static, pre-functional and functional performance — with witness dates, sign-off and an audit trail against CIBSE Commissioning Code M and BSRIA BG 8/2009.

Witness packs, issued on time

The pack that is always late gets assembled for you. CX Core builds the witness pack from the record sheets and evidence on the system, runs an AI-assisted readiness check against the hold-point requirements, flags what is missing, and exports a branded PDF ready to issue for review.

Asset register down to equipment level

Locations, phases and equipment — AHUs, FCUs, pumps, boards — imported from a CSV or an equipment schedule, each with its own pre-functional and functional test checklists.

QR labels and site capture

Print QR labels for plant, scan on site and go straight to that asset's checklist. Photos, readings and signatures are captured where the work happens.

Issues and defects log

Raise an issue straight from a failed check, with severity, owner, due date and photos. Outstanding items flow into the reports and the handover pack automatically.

Voice-to-sheet dictation

Speak the readings — "flow rate 5.2 litres a second, pass" — and CX Core fills the right fields on the sheet. Built for gloves, ladders and plant rooms.

How a job runs

One route from strategy to handover

01

Set the structure

Locations, phases and systems, then bulk-generate the assets and their checklists.

02

Capture on site

Record sheets, photos and readings on a phone or tablet, by hand or by voice.

03

Issue the pack

AI-assisted readiness check, then a branded witness pack out to the client before the visit.

04

Witness and close out

Record the witness result, raise issues on failures and clear them against due dates.

05

Hand over

One handover pack: hold-point certificates, completed sheets, evidence and the outstanding issues list.

Commissioning only, or the full platform

Take CX Core on its own

Plenty of teams only want the commissioning side, so CX Core stands alone: create a project with commissioning switched on and nothing else appears. If BREEAM, whole life carbon, circular economy or NABERS UK come up later, switch the module on and the same project record carries it — the Man 04 evidence you already captured is reused, not re-typed.

Request your free pilot, contact us

Get in touch

Contact us

Ask about BREEAM, whole life carbon, circular economy or commissioning support, or book a demo of Verdi for your team.